The ideal off-site construction for Monaco

 

Part by Part offers immense possibilities for the development of living space without increasing the footprint of buildings. It is thus possible to expand the living space of existing buildings by creating new floors on already built buildings, using an efficient and fast industrial process.

Founded in 2012, Part by Part has already built more than 50,000 m2, all with a constant technological evolution dedicated to research in the field of industrialised manufacturing.


This so-called "off-site" manufacturing allows for faster and cleaner construction.

The technology developed by PART by PART allows the site to be occupied as little as possible, thus reducing nuisances to a minimum. The building site is only occupied for the assembly and finishing of the factory-made structures. This means: less noise pollution in the city for neighbouring residents, less waste generated by the work, roads blocked for less time, fewer site installations, etc. This is real progress for Monaco, where construction sites are a real headache.